Northern California CA Contractor #1117491 OSHA-10 Certified

Pool Demolition in Northern California

Remove an unused pool with one crew handling demolition, hauling, backfill, grading, and cleanup. Written quote within 24 hours. Cleanup included.

Call (916) 909-1359
5.0 Rating · 117 5-Star Reviews Wisetack Financing Available Our Own Crew, Every Job

See your price in 60 seconds.

Real number, on screen. No phone tag.

What are you tearing down?

CA Contractor #1117491 · Insured · Free walkthrough confirms final price.

Remove Your Unused Pool With One Licensed Crew

Demo Patrol manages pool draining, demolition, debris hauling, compacted backfill, final grading, and cleanup under one written quote. Owner-operated heavy equipment and an in-house crew give you one point of contact for pool demolition throughout Northern California.

The instant quote calculator gives you an initial range in minutes. A written quote follows within 24 hours of the site assessment.

Every pool demolition quote includes:

  • Site assessment and written quote within 24 hours
  • Demolition permit handling
  • Utility disconnect and pool equipment removal
  • Demolition and debris hauling
  • Backfill in compacted lifts and final grading
  • Jobsite cleanup

CA Contractor #1117491

Licensed California demolition contractor.

OSHA-10 Certified

OSHA-10 certified crew on every pool demolition.

A+ BBB Accredited

Accredited business with an A+ rating.

Written Quote Within 24 Hours

You get the scope, the method, and the number in writing.

Cleanup Included

Jobsite cleanup is part of every quote, never billed separately.

Own Crew, Own Equipment

Owner-operated heavy equipment and an in-house crew. One point of contact.

Partial Fill or Full Removal

Demo Patrol provides partial and full pool removal based on what you plan to do with the yard, local requirements, property access, and how the pool was built. We remove concrete, gunite, fiberglass, and vinyl liner in-ground pools. Most of our pool demolition work is residential, and commercial pool removal is quoted after a site inspection.

Most Common

Partial Pool Removal

$6,500 to $13,000
typical calculator range

The crew breaks down the upper section of the pool shell, perforates the floor for drainage, and backfills the cavity in compacted lifts. The lower shell stays underground. This option is also called pool fill-in or pool abandonment in place.

Partial pool removal suits homeowners who want usable yard space for lawn, patio, or landscaping and do not plan to build over the former pool site.

For New Construction

Full Pool Removal

$19,000 to $29,000
typical calculator range

Full pool removal takes out the entire pool shell, steel, plumbing, and decking, then backfills the excavation in compacted lifts.

Building over the site, for example an ADU or addition, generally calls for full pool removal with compacted backfill, and a compaction test when the building department requires one. Your building department has the final say.

Partial vs Full Pool Removal at a Glance

Partial Pool Removal Full Pool Removal
What is removed Upper section of the pool shell Entire pool shell, steel, plumbing, and decking
What stays Lower shell stays underground Nothing stays
Backfill Cavity backfilled in compacted lifts Excavation backfilled in compacted lifts
Can you build over it No Yes, with compacted backfill and a compaction test when required
Typical calculator range $6,500 to $13,000 $19,000 to $29,000
Best for Usable yard space: lawn, patio, or landscaping Future construction: ADU or addition

Pool Demolition Cost

Typical instant quote calculator ranges are $6,500 to $13,000 for partial pool removal and $19,000 to $29,000 for full pool removal. These ranges give you a planning figure. The written quote is final and reflects actual site conditions and the scope you choose.

Ranges updated September 2026.

What Shapes the Written Quote

  • Pool size and type: larger pools and certain construction methods cost more to remove.
  • Removal method: full removal requires more excavation and hauling than partial removal.
  • Site access: tight access can require smaller equipment or more labor.
  • Fill and hauling: clean fill dirt up to $450 per 15-yard load; deck and pavers go into the cavity, lowering fill needed.
  • Soil compaction: full removals only, when the building department requires it, using Raney Geotechnical in Sacramento.
  • Permits: permit requirements and fees vary by jurisdiction.

Wisetack Financing Available

Pool removal is a real investment. Wisetack financing is available for pool demolition, with preapproval through a link on our website. The deposit is $1,000 or 10% of the project cost, whichever is less, and the balance is due on completion. We also take Zelle, credit card, cash, wire, and check.

How We Remove a Pool

Most pool demolition projects take two to five days on site. Permits, access, weather, and scope can affect scheduling.

01

Assess the Pool and Confirm the Scope

The team reviews pool construction, equipment access, and your future plans for the site. Demo Patrol recommends partial or full removal and provides a written quote.

02

Coordinate Permits and Utility Disconnects

Demo Patrol handles the demolition permit and confirms each utility disconnect before excavation begins. Water, gas, and electrical lines serving the pool are disconnected and pool equipment is removed.

03

Drain, Demolish, and Haul Away Debris

The crew drains the pool, breaks up the shell and decking, and hauls debris from the property. A mini excavator and a skid steer with a hydraulic breaker handle the demolition. On a full removal, the pool deck, coping, and skimmer come out with the shell. Concrete goes to a recycling yard rather than a landfill. Debris disposal is included in the quote.

04

Backfill, Compact, and Grade

Clean fill is placed in compacted lifts. The crew shapes the final grade, applies topsoil, and completes the included jobsite cleanup. The site restoration leaves the area ready for lawn, landscaping, a patio, or new construction.

A Real Sacramento Pool Removal

An abandoned in-ground pool in a Sacramento backyard. Concrete shell broken out, cavity excavated and backfilled, pad graded clean. The homeowner got their yard back.

Demo Patrol also completed a full pool removal alongside the demolition of a 3,500 square foot house in the Arden Oaks area of Sacramento. One crew, one set of equipment, one written quote.

Abandoned in-ground kidney pool with debris and overgrowth in Sacramento backyard
Before
Neglected kidney pool. Cheaper to remove than restore.
Kubota skid steer with hydraulic breaker demolishing concrete pool shell in Sacramento
During
Skid steer with hydraulic breaker working the concrete shell.
Cleared and graded backyard pad where Sacramento pool once was, ready for new use
After
Backfilled, compacted, and graded. Ready for lawn, patio, or ADU.
Video thumbnail: $13.5k Pool Demolition in Sacramento California with CAT 306 Mini Excavator and Kubota Skid Steer
A real pool demolition in Sacramento, filmed on the job. Our own crew and equipment.

Why Homeowners Remove Pools

Ongoing maintenance costs, safety concerns with children or pets, the wish for usable yard space, plans for an ADU or addition, and an easier home sale are the reasons we hear most.

Ongoing Maintenance Costs

Chemicals, pumps, filters, and repairs keep costing money whether the pool gets used or not.

Safety Concerns

An unused pool is a hazard for children and pets. Removing it removes the risk.

Usable Yard Space

Partial pool removal gives you back the footprint for lawn, patio, or landscaping.

Plans for an ADU or Addition

Full pool removal with compacted backfill prepares the site for new construction.

An Easier Home Sale

Not every buyer wants a pool. An open yard gives buyers room for their own plans.

Where We Remove Pools in Northern California

Sacramento Region

Sacramento, Roseville, Elk Grove, Folsom, Citrus Heights, and Placer, El Dorado, Yuba, Sutter, and Nevada counties.

Chico Region

Chico, Paradise, Magalia, Oroville, and Butte County.

Bay Area

Napa, Solano, Contra Costa, and Alameda counties, with scheduling coordinated around property location and access.

Pool Demolition
FAQs

Typical calculator ranges are $6,500 to $13,000 for partial removal and $19,000 to $29,000 for full removal. Pool construction, access, hauling, fill, compaction, permits, and the selected method determine the final written quote.
Partial removal creates usable yard space when you do not plan to build over the location. Full removal is the right option when the site will support future construction.
Pool removal requires a demolition permit in most Northern California jurisdictions. Demo Patrol handles the permit process during project planning.
The process covers assessment, utility disconnect, draining, demolition, debris hauling, compacted backfill, and final grading. The exact work depends on whether you select partial or full removal.
Most projects take two to five days of on-site work after scheduling and approvals. Difficult access, larger pools, weather, and permit timing can affect the overall schedule.
A future structure requires full removal rather than partial removal. Share your construction plans during the assessment so the correct demolition and backfill scope is selected.
Concrete and other debris are loaded out and hauled away. Concrete goes to a recycling yard through Demo Patrol's concrete recycling partnership.
Clean fill placed in compacted lifts creates a stable finished area. Tell the estimator how you intend to use the site so the compaction and grading scope can be planned accordingly.
Yes, Wisetack financing is available for pool demolition. Preapproval is through a link on our website. The deposit is $1,000 or 10% of the project cost, whichever is less, and the balance is due on completion. We do not offer in-house financing.

Have a question we didn't cover?

Call (916) 909-1359

Get a Written Pool Demolition Quote

One licensed crew, one plan for demolition, hauling, backfill, grading, and cleanup. Use the instant quote calculator, then get your written quote within 24 hours.

Want a number before you call? See an instant price range in about a minute.

No Obligation 24-Hour Response Written Quotes